Archive for April, 2008

WEEK FIFTY SIX

April 19, 2008

Wendera.jpg Wendera 2.jpg

“Wendera” 19/04/08

Look what they’ve done to our boat!!!!

Remember last week’s pristine white???

    

 

It’s all O.K. It appears they put on the black paint so that they can

sand it off to show up high and low spots!

More sanding, sanding, sanding!

They’re forgiven.

Sanding black off.jpg Sanding black off.2.jpg

Sanding black off.3.jpg Sanding black off.4.jpg

See?

It will all lead to a finer finish in “six weeks”.

Preparing the daggerboards for a final coat.

WATCH THIS SPACE

Watch this space.jpg

WEEK FIFTY FIVE

April 12, 2008

WOW.jpg

“Wendera” 12/04/08

Wow, isn’t she looking a million dollars?

This week’s pictures celebrate the painting of “Wendera”,

viewed from all angles, complete with a “pirate”,

dropsheets galore and the lounge – fantastic!.

WOW 2.jpg Cockpit Wow.jpg

Fwd Wow.jpg STBD Wow.jpg

Spraying.jpg Spraying 2.jpg

Dropsheets.jpg Dropsheets 2.jpg

Dropsheets 3.jpg Swimming platform.jpg

Outside looking in.jpg Still some more sanding.jpg

Mixing paint.jpg Pirate.jpg

Lounge.JPG

And then this…… I won’t make it another contest because

I have never said who won the last one……. sooooo…

It’s the Site Manager’s nocturnal abode. It’s a “Dogloo” -

an igloo for a dog!

What is hiding.jpg

All that shiny white stuff on “Wendera” is just undercoat!!

What will she look like with the final coat?

TO WEEK FIFTY FOUR

April 5, 2008

“Wendera” 05/04/2008

Whole boat.jpg Whole boat 2.jpg

Whole boat 3.jpg Whole boat 4.jpg

Whole boat 5.jpg

The check list to make sure nothing is missed.

Check list.jpg

All hands to the pumps to sand those cupboard doors.

Cupboard doors.jpg Cupboard doors 2.jpg

Cupboard doors 3.jpg Cupboard doors 4.jpg

The dinghy and outboard arrive and are unpacked.

Dinghy delivered.jpg Dinghy delivered 2.jpg

Dinghy delivered 3.jpg Unpacking dinghy 3.jpg

Unpacking dinghy 2.jpg Unpacking dinghy 4.jpg

Outboard delivered.jpg Outboard delivered 2.jpg

Hot water tank fitted and cockpit shower.

Hot water system.jpg Swim platform shower.jpg

Looking in port door in cockpit furniture – rear BBQ gas and fuel cut-off.

Port door in cockpit furniture bbq gas and port fuel shut off.jpg

240 volt plug.

240 power point.jpg 240 power point 2.jpg

Hot and cold water pipes.

Cabling to.jpg Cabling to 2.jpg

Fitting the sink in the galley.

Fitting sink 2.jpg Fitting sink.jpg

Laser level in action and peeping in a porthole.

Laser level at work.jpg Looking in.jpg

Mixing paint.

Mixing paint.jpg Mixing paint 2.jpg

Port engine and surrounds.

Port engine room.jpg Port engine room and tools.jpg

Port engine room hatch.jpg

Starboard engine and surrounds.

Starboard engine.jpg Starboard engine room.jpg

Starboard engine room hatch.jpg Starboard engine room hatch 2.jpg

Port helm station progressing.

Port helm station.jpg Port helm station 2.jpg

Masking the hulls and painting.

Port hull.jpg Port hull masked for painting 2.jpg

Port hull masked for painting.jpg Port hull painting.jpg

Port hull painting 2.jpg Port hull painted.jpg

Starboard hull masked.jpg Port silver shoulder.jpg

Side stay preparation.

Port sidestay fitting.jpg

Some general views including “At the movies” and “Site manager”

Port stern view.jpg Tools of the trade.jpg

At the movies.jpg Boat deck forrard.jpg

Tangle of wires.jpg Site manager.jpg

Site manager 2.jpg Site manager 3.jpg

“I’m still watching you – don’t slacken off!” and “Thanks”

Site manager 4.jpg S.M. grooming.jpg

More next week. The end is in sight.