Archive for January, 2008

WEEK FORTY FOUR

January 26, 2008

Bow half.jpg Stern half.jpg

“Wendera” 26/01/08 Both halves for you to fit together.

Undercoat 2.jpg Undercoat 3.jpg

Undercoat 4.jpg Undercoat 5.jpg

Undercoat 6.jpg Undercoat 7.jpg

Undercoat.jpg

The first coat of undercoat is applied.

Glueing saloon module.jpg Saloon glued.jpg

Cleaning up glue.jpg

The saloon module is glued in place. Note the water tank. Cleaning up

the glue afterwards posed some awkward positions.

Galley module glued in.jpg Galley module glued in 2.jpg

Difficult place.jpg Difficult place 2.jpg

Difficult place 3.jpg

The galley module is glued in place. Glassing it in afterwards

was a job for a contortionist.

Sanded off.jpg Sanded off 2.jpg

Sanded off 3.jpg Sanded off 4.jpg

Sanded off 5.jpg Sanded off 6.jpg

Remember that first coat of undercoat above? Well, it has all

been sanded back. You put it on, you rub it off!!

Stbd motor.jpg

Starboard motor with exhaust pipes and muffler box.

WEEK FORTY THREE

January 19, 2008

Whole view wide.jpg Whole view wide2.jpg

“Wendera” 19/01/08

Meet Linda.jpg

Staff Profile

Meet “Linda”, dust extractor extraordinaire.

Trusted, long standing employee. Works as powerful vacuum

cleaner as well as attaching to sander to collect dust.

Bow high build primer.jpg

High Build primer applied to starboard bow.

Torture board.jpg Torture board3.jpg

This is “torture-boarding”. Chris sanding the High Build on the port bow.

Note the dust ( torture residue ) on the floor!!

Nav station mockup.jpg

Navigation station mock-up.

Progress on inverter.jpg Cabling conduits.jpg

Further progress on that inverter, and conduit installation.

Kitchen module in place.jpg Kitchen2.jpg

Kitchen.jpg

Views of the kitchen module in place.

View from cockpit.jpg View from cockpit2.jpg

View from cockpit3.jpg View from cockpit wide.jpg

Views from the cockpit.

View saloon.jpg View saloon2.jpg

View saloon top.jpg

Views of the saloon.

Port side wide.jpg Port steps wide.jpg

Stbd steps wide.jpg View from bow port wide.jpg

View from bow stbd wide.jpg View from bow wide.jpg

A series of wide angle shots taken on the Canon HV20 with .45 X

wide angle lens.

WEEK FORTY TWO

January 12, 2008

Whole boat Canon Crop.jpg

“Wendera”.

You’re right. Same shot as last week!!

But look what’s been happening.

Port window1.jpg Port window2.jpg

Port window3.jpg Stbd window1.jpg

Stbd window2.jpg Stbd window3.jpg

Port and Starboard windows in the main bulkhead have been

cut, shaped, bogged, rubbed back, window surrounds dry fitted

bogged again and rubbed back again. You’ll see the windows in

place next week.

Saloon seat in place.jpg Saloon seat in place3.jpg

The saloon seat is in place. Note infrastructure for the inverter.

Inverter.jpg

The inverter positioned beneath the port end of the saloon seat.

Coffins or what.jpg

No, they are not plots for burying anything. They are door jambs

glassed and awaiting positioning on doors.

Port aft bunk.jpg Stbd aft bunk.jpg

Port and starboard aft berths are spacious. All ready for painting.

Port cabin roof.jpg Stbd cabin roof.jpg

Port and starboard cabin roofs strengthened and glassed.

Ensuite.jpg Ensuite2.jpg

Ensuite3.jpg

Glueing and glassing continued in the ensuites.

Hole surround.jpg Hole surround2.jpg

Tim made rubber surrounds for the holes where cables and lines

go through the deck.

Bogging.jpg Bogging2.jpg

Bogging3.jpg

All the time there are creations being routered and bogged ready

for cutting out doors.

Props in place.jpg Kitchen glassed.jpg

Props are in place to support the bridge deck while the saloon

modules are glassed in. Yes, that’s the kitchen furniture again

upside down with all the joints glassed. Next week, the other side.

WEEK FORTY ONE

January 5, 2008

Whole boat Canon Crop.jpg

There she is. Not much difference to see externally, but lots

accomplished inside. Another short week with the New Year

break.

Anchor chain channel.jpg Anchor chain channel2.jpg

The anchor chain channel was created.

Glassing around windows.jpg Glassing around windows2.jpg

All the glassing around the windows in the roof was completed.

Kitchen kerfed front added2.jpg Fibreglassed foam kitchen top.jpg

The kerfed front of the kitchen module was added and the foam

top for the unit was glassed.

Shelves in Stbd ensuite2.jpg Port hanging space.jpg

Shelves in the starboard ensuite and the port hanging space.

Plky pads for winches.jpg

Plywood pads for the winches on the roof were glued in place.

Power control panel.jpg Hot water preparation.jpg

The cabinet for the power control panel was commenced and

Paul connected up the fittings on the hot water unit.

Staunchions.jpg Staunchions2.jpg

Experimenting with placement of “staunchions”. Won’t be long

and the stainless steel equivalents are in place.