Archive for October, 2007

WEEK THIRTY

October 20, 2007

U2.jpg

Not the band, but Chris’s little joke alluding to the fact that Ann-Maria will ensure that the boat will be provisioned to exceed design payload capacity!!! ( Remember the WWII German U Boats? )

Whole boat 2.jpg

Current boat with the port side undercoated and the port and starboard steps in the foreground.

Painting port hull 5.jpg Painting port hull 4.jpg

And this is just undercoat!

Port aft bunk and dressing room.jpg Stb aft bunk and dressing room.jpg

Tim’s port side bunk and dressing room and Ben’s starboard side replica.

Stbd steps with hatch out.jpg Stbd steps.jpg

Starboard cockpit steps with engine hatch removed.

Stove.jpg

Miss can’t wait for this to be installed in the galley module.

Saloon seat.jpg

Saloon seat with galley module in left foreground.

Port ensuite vanity.jpg

Port ensuite with vanity recess prepared.

 

WEEK TWENTY NINE

October 13, 2007

Port deck 4.jpg

Lots happening this week. Here’s a great bit of “vis”. The port deck is in place.

Deck going up.jpg Port deck 5.jpg Port deck  

Port deck 2.jpg    Port deck 3.jpg

Stages of the deck going up. Note sidestay fitting in picture 3 and

daggerboard case in picture 4.

Port steps to galley.jpg    Port steps to galley 2.jpg

Port steps to saloon.

Stbd steps to galley.jpg    Stbd steps to galley 3.jpg

Starboard steps to saloon.

Stbd engine exhaust.jpg    Stbd engine exhaust and filters.jpg

Fitting of engine hoses and filters.

Port cockpit 1.jpg

Port side cockpit furniture in place.

Tim’s bunk

Port aft bunk ( Tim’s ) showing underside of port side cockpit module.

WEEK TWENTY EIGHT

October 6, 2007

Current view.jpg

Looks the same as last week? Wait until you see what’s happened inside!!

Shed mascot - Bluey.jpg Shed mascot - Bluey 2.jpg

New addition to the “Building the Cat” family.

“Bluey”, the shed mascot, arrived this week.

The week was a furniture fest. All those furniture modules you have seen in previous

weeks being assembled, dry-fitted, or stacked under the bridge deck, are now in place,

glued and glassed.

Starboard side furniture.jpg Starboard side passage.jpgStarboard side furniture 2.jpg

Starboard side furniture 4.jpg Starboard steps.jpg

Starboard side furniture 3.jpg Starboard steps 2.jpg Starboard steps 3.jpg

Fitting starboard steps.jpg

Starboard furniture and steps to the saloon.

Port Ensuite.jpg Port side furniture.jpg Port side furniture 2.jpg

Port side furniture 3.jpg Port side furniture 4.jpg Port side passage.jpg

Port side furniture.

Tim’s bunk 

Port aft bunk – Tim’s bunk.

Chris glassing.jpg Chris glassing 2.jpg Chris glassing 3.jpg

Chris glassing in some pretty tight places.

Conduits.jpg

Picture showing conduits which will carry fuel, water, hydraulics, electricals.

Hydraulics.jpg

Helm pump, rudder ram and fittings.